JCB 200 Series Excavator ATS Setup and Calibration Procedure

Here is the instruction show you guide on how to do Advanced Tool Select and Basic Tool Select system setup and calibration.

 

Related Contents:
2026 JCB ServiceMaster 4 v26.7.4 Free Download for Win 10 Win11

2017 JCB Parts Plus+ and Repair Service Manual Free Download

JCB DLA Diagnostic Kit

 

 

Setup Procedure

The image below shows the ServieMaster Vehicle Setup tool that’s used to setup the machine and select which options are fitted.

The ATS/BTS options (High Flow and Low Flow Circuits) are part of this tool.

JCB 200 Series Excavator ATS Setup and Calibration Procedure (1)

 

There are multiple selections for:

Joystick Type

JCB 200 Series Excavator ATS Setup and Calibration Procedure (2)

Pedal Type

JCB 200 Series Excavator ATS Setup and Calibration Procedure (3)

Flow Circuit Type

JCB 200 Series Excavator ATS Setup and Calibration Procedure (4)

 

Calibration Procedure

1.Setup a Single Attachment in the Operator Display as:

Selector – Grab

Flow Circuit: 2 Way

Max Flow: 220 lpm

Relief Pressure: 200 bar

 

2 Open the Secret Menu (Display Menus -> Information -> Scroll to Service -> Press and Hold Camera Button and Rotary Button -> Select Secret Menu)

  • Using a Hydrotechnik tool connect a pressure sensor to the Pump diagnostic port.
  • ± (Increase/Decrease) HF Pressure Calibration Value to get the correct Pressure

JCB 200 Series Excavator ATS Setup and Calibration Procedure (5)

The HF Pressure Relief Value is calibrated.

 

1 Setup a Single Attachment in the Operator Display as:

Selector – Grab

Flow Circuit: 2 Way

Max Flow: 150 lpm

Relief Pressure 200 bar

 

2 Open the Secret Menu (Display Menus -> Information -> Scroll to Service -> Press and Hold Camera Button and Rotary Button -> Select Secret Menu)

Using a Hydrotechnik tool connect a flow meter on A side of Main Valve Block

± (Increase/Decrease) HF Flow Calibration Value to get the correct Flow.

JCB 200 Series Excavator ATS Setup and Calibration Procedure (6)

The HF Flow is calibrated.

 

1 Setup a Single Attachment in the Operator Display as:

Selector – Grab

Flow Circuit: 2 Way

Max Flow: 40 lpm

Relief Pressure: 200 bar

 

2 Open the Secret Menu (Display Menus -> Information -> Scroll to Service -> Press and Hold Camera Button and Rotary Button -> Select Secret Menu)

Using a Hydrotechnik tool connect a pressure sensor to the Pump diagnostic port.

± (Increase/Decrease) HF Pressure Calibration Value to get the correct Pressure

JCB 200 Series Excavator ATS Setup and Calibration Procedure (7)

The LF Pressure Relief Value is calibrated.

The LF Flow value does not require calibration.

After performing calibrations the original attachment settings should be returned.

 