HINO DX3 allows you to reset HINO truck ECU learned values.This instruction show you guide on how to do that.
Related Contents:
2024.03 HINO Diagnostic Explorer DX3/DX2 Diagnostic Software Free Download
HINO Trucks EPC Electronic Parts Catalog 2018 2016 Free Download
Procedures:
1 Select Learned Values on the System selection screen.
(System selection screen)
2 When you select a system, a list of Learned Values set for the device is displayed.
(Learned Values screen)
3 You can reset the Learned Values by checking the items you would like to reset and pressing the [Reset] button.
(Learning Values screen)
[Reference]
The value to be reset is the preset initial value.
4 A confirmation screen will be displayed. Check the contents and click or press the [OK] button.
(Reset Confirmation screen)
[Reference]
Click or press the [Cancel] button to return to the Learned Values screen.
5 A message is displayed when writing to the device is complete.
(Reset Completion screen)
[Reference]
• This message is displayed regardless of whether the reset was successful or not.
• Items that have been successfully reset are displayed as
Successful in the ECU writing field.
• Items for which reset has failed are displayed as Failed in the ECU writing field.
More HINO DX3 User Guide,please refer to:How to Use HINO DX3
This instruction show you guide on how to solve Liebherr machine emergency stop ignition on…
This instruction show you guide on how to solve Doosan machine trouble code U043D message…
Here is the instruction show you guide on how to solve AGCO machine trouble code…
Detroit DD13 EPA10 (2010-13) trouble code SPN 84 FMI 13 (MCM) J1939 Wheel-based vehicle speed…
This instruction show you guide on how to solve Caterpillar C9 engine trouble code 36…
Kubota L3301 L3901 Excavator Safety Valve Setting Pressure Test Using Injection Nozzle Tester 1 Remove…