The initial charging of the A/C system is performed from the high-pressure side with the engine stopped.And next, this method must be followed by charging from the low-pressure side with the engine running.More repair case for Suzuki,please refer to:Suzuki Trouble Repair

 

Related Contents:

2019 2014 Suzuki Worldwide Automotive EPC Free Download

 

Procedures:
1)Check to make sure that hoses are routed properly after evacuating the system.
2)Connect low charging hose (1) and high charging hose (2) of the manifold gauge set (3) in position.
Thus open refrigerant container valve (4) to purge the charging line.
3)Open the high-pressure side valve (6) and charge refrigerant to system.
4)After a while, open the low-pressure side valve (5) and close the high-pressure side valve (6).

Make sure that high pressure-side valve is closed securely.

5) Start engine and keep engine speed at 1,500 rpm.
Then, operate A/C system.
6) Charge A/C system with refrigerant in vapor state. At this time, refrigerant container should be held upright.
7) When refrigerant container (3) is emptied, the use following procedure to replace it with a new refrigerant container (3).
a) Close low pressure valve.
b) Replace empty container (3) with a refrigerant container which has been charged with refrigerant. When using refrigerant container tap valve (4), use the following procedure for
replacement.
i) Retract needle (1) and remove refrigerant container tap valve (4) by loosening its plate nut (2).
ii) Install previously-removed refrigerant container tap valve (4) to a new refrigerant container (3).

c) Purge any air existing in center charging hose.
When using refrigerant container tap valve, use the following procedure to purge air.
i) Once fully tighten refrigerant container tap valve and then loosen (open) plate nut slightly.
ii) Open low pressure valve of manifold gauge set a little.
iii) As soon as refrigerant comes out with a “hiss” (1) through a clearance between refrigerant container and tap valve, tighten plate nut as well as manifold gauge set low pressure valve.
iv) Turn handle of tap valve clockwise so that its needle is screwed into the new container to make a hole for refrigerant flow.

8) After the system has been charged with specified amount (570 ± 30 g) of refrigerant or when low pressure gauge and high pressure gauge have indicated the following specified value, close low pressure side valve on manifold gauge set.

auto

Recent Posts

AGCO EEM5 Stage V CORE 75-80 Supply Module

The supply module (SM) is a part of the vehicle SCR system. The SM is…

7 mins ago

Yale G807 Brake System Air Bleed Guide

Yale G807 Brake System Air Bleed Guide   Related Contents: 2023 Yale PC Service Tool…

3 days ago

Bobcat G2 Stage V Engine P000F Common rail pressure Open Error Solution

This instruction show you guide on how to solve Bobcat G2 Stage V engine P000F…

6 days ago

How to Solve CASE 7120 IH 20 Series Axial-Flow Combine Creep Problem

Here is the instruction show you guide on how to solve CASE 7120 IH 20…

1 week ago

How to Jump-start Engine for MANITOU MT6034 Construction Telehandler

If the battery becomes discharged or does not have enough power to start the engine,…

2 weeks ago

Liebherr Machine P1121 DEF Pump Out of Service Error Solution

Here is the instruction show you guide on how to solve Liebherr machine trouble code…

2 weeks ago