Here is the illustration show you procedures on how to remove engine connection direct mount and remote mount for Doosan DL250-3 excavator.
Related Contents:
2022 Doosan Data Monitoring System DMS-5 DMS-3 Free Download
Daios Doosan EPC Excavator Part Catalog 2017 Download & Installation
Procedures:
Engine Connection (Direct Mount)
Remove hexagon screw (2, Figure 26) and separate flexplate (1,Figure 26) from converter (3, Figure 26).
Separate converter (1, Figure 27) from transmission using lifting device.
Engine Connection (Remote Mount)
1.Remove hexagon screws (1, Figure 28) and remove washer.
Remove bolts (2, Figure 28) on cover/converter bell housing.
NOTE: Mark radial installation position of cover/converter bell housing by center punch.
2.Separate cover from converter bell housing using lifting device.
3.Pull off output flange.
4.Press input shaft and converter out of cover (ball bearing).
5.Snap out retaining ring (1, Figure 32) and remove ball bearing (2, Figure 32).
6.Remove hexagon screws (1, Figure 33) and remove flex plate (2, Figure 33) from converter.
7.Remove hexagon screws (1, Figure 34) and remove flex plate (2, Figure 34) from input shaft (3, Figure 34).
More topics for Doosan,please refer to:Doosan Trouble Repair
This instruction show you guide on how to solve Doosan machine trouble code U043D message…
Here is the instruction show you guide on how to solve AGCO machine trouble code…
Detroit DD13 EPA10 (2010-13) trouble code SPN 84 FMI 13 (MCM) J1939 Wheel-based vehicle speed…
This instruction show you guide on how to solve Caterpillar C9 engine trouble code 36…
Kubota L3301 L3901 Excavator Safety Valve Setting Pressure Test Using Injection Nozzle Tester 1 Remove…
JCB Engine Fault Derate When a fault is detected, the ECU determines the severity of…