This is a guide focus on how to adjust valve clearance for Komatsu excavator PC130.All workshop manual and part catalogue you can refer to:Komatsu CSS Full Set 2018 2014 Parts Viwer Free Download
Note:Stop the machine on a level ground and lower the work equipment to the ground.
Adjust the valve clearance under the following condition.
Engine coolant temperature: Normal temperature
Procedures:
1.Open the engine hood and remove maintenance step (1) and air supply hose (2) on the engine
2.Remove cylinder head cover (4).
3.Remove plate (5) on the starting motor and insert gear B1.
4.Remove compression top dead center TDC check plug (6) from the flywheel housing.
Rotate the crankshaft forward with gear B1 and set it so that you can see the white mark of the flywheel.
When the No. 1 cylinder is at the compression top dead center, the rocker arm of the No. 1 cylinder can be moved by the valve clearance with the hand. If the rocker arm cannot be moved, the No. 1 cylinder is not at the compression top dead center. In this case, rotate the crankshaft one more turn.
How to Use Hyster Yale PC Service Tool Password Management Function Note: To access…
When you use IDSS diagnostic scan to do some function,it may occur communication error.Sometime you…
Deutz engine EOL test (end of line) is required to ensure the EAT functionality. Conditions…
This instruction show you guide on how to solve Scania truck articulation control system ACS…
Magneti Marelli 49FB – Fiat ECU Pinout More ECU PINOUT Components: ECU Modules Repair…
After ECU reparogramming,it is necessary to write new engine number and machine ID into ECU.So…