Categories: Truck Repair

ISUZU 4JJ1 Euro 4 N Series Truck EGR Valve Removal and Installation Guide

When you need to replace new or used EGR valve,you need to remove and install EGR valve and cooler.Here comes the steps on how to remove and install EGR valve and cooler for ISUZU Euro 4 N series truck with 4JJ1 engine.

 

Related Contents:

ISUZU IDSS Diagnostic Tool

2023 2019 Isuzu G-IDSS Diagnostic Software Free Download (Troubleshooting Guide Included)

 

Procedures:

1.Drain the engine coolant.

2.Remove the AC generator.

3.Remove the engine cover.

4.Remove the fan guide bracket right.

5.Remove the exhaust adaptor and turbocharger water return pipe.

6.Remove the degassing hose.

7.Remove the degassing pipe.

8.Remove the heat protector.

9.Remove the EGR cooler.

Remove the(IN) and(OUT) rubber hoses of the water pipe, and remove the EGR cooler and the gasket.

10.Remove the EGR valve connector.

11.Remove the EGR valve.

 

Installation

If the procedures or methods for assembling the EGR device are mistaken, that can lead to cracks of pipe or gas leaks. Always follow the procedures.

1.Install the EGR valve.

Tightening torque:27 N-m(2.8kg-m/20 lb-ft)

2.Install the EGR valve connector.

3.Install the EGR cooler.

a.Attach the gasket and the EGR cooler, and temporarily tighten them in the order specified in the diagram.

b.Securely tighten them at the specified torque in the order as shown in the diagram.

Tightening torque: Nuts, Bolts(1)-(5)27 N·m(2.8kg-m/20 lb-ft)

4.Install the (IN) and (OUT) rubber hoses of the water pipe.

Install the rubber hose(IN) so that it does not interfere with the exhaust manifold heat protector.

5.Install the heat protector.

Tightening torque:25 N-m(2.5kg-m/18 lb-ft)

6.Install the degassing pipe.

a.Attach the degassing pipe, and temporarily tighten them in the order specified in the diagram.

b.Securely tighten them at the specified torque in the order as shown in the diagram.

Tightening torque Nuts, Bolts

(1),(3),(4),(5):10N-m(1.0kg-m/87 lb-in)

Nut(2):25N-m(2.5kg-m/18 lb-ft)

7.Install the exhaust adaptor and turbocharger water return pipe.

8.Install the fan guide bracket right.

9.Install the engine cover.

10.Install the AC generator.

11.Refill the engine coolant.

For more guide about ISUZU,please refer to:ISUZU Trouble Repair.

auto

Recent Posts

How to Solve Doosan Machine U043D CAN Receive Frame Counter Error

This instruction show you guide on how to solve Doosan machine trouble code U043D message…

5 days ago

AGCO Machine Trouble Code SPN 1485 – FMI 03 Solution

Here is the instruction show you guide on how to solve AGCO machine trouble code…

1 week ago

Detroit DD13 J1939 Wheel-Based Vehicle Speed Sensor Signal Missing

Detroit DD13 EPA10 (2010-13) trouble code SPN 84 FMI 13 (MCM) J1939 Wheel-based vehicle speed…

3 weeks ago

How to Solve Caterpillar C9 Vehicle Speed Signal Invalid?

This instruction show you guide on how to solve Caterpillar C9 engine trouble code 36…

4 weeks ago

Kubota L3301 L3901 Excavator Safety Valve Setting Pressure Test

Kubota L3301 L3901 Excavator Safety Valve Setting Pressure Test Using Injection Nozzle Tester 1 Remove…

4 weeks ago

JCB 200X Series Machine Reduced Power Mode Engine Derate

JCB Engine Fault Derate When a fault is detected, the ECU determines the severity of…

1 month ago