This instruction show you guide on how to use HITACHI MPDr to perform HITACHI ZX-6 air bleeing from the DEF/Adblue defrosting piping.
What You Need?
Hitachi AllinOne MPDr v3.32 v2.25 2021 Diagnostic Software Free Download
Procedures:
1 Click [Air Bleeding from the DEF/Adblue Defrosting Piping].
2 Click [Start].
The forced operation is continued while “Executing” is displayed.
When “Excuting” icon disappears, the operation completes.
Click [Stop] if you want to stop the forced operation.
3 Turn the key swith OFF
Details steps:
Operate the coolant control vaive for 150 seconds.
Follow the belaw procedure.
[Procedures]
1) Turn the key switch ONL. (Be sure not to run the engine.)
2)Press the [Start] button.
3) Ensure that the [Executing] icon is displayed. Start the engine within 10 seconds.
4) After starting the engine. set the engine control disl to the full (fast idle) position
5)Maintain the full (fast idle) position until the remaining time becomes 0 second.
6)When the [Executing! icon disappears, the operation completes.
7) Turn the key switch OFF.
This instruction show you guide on how to display service menu for Hitachi ZX890-7 excavator.…
Here is the instruction show you guide on how to do Advanced Tool Select and Basic…
Here car-auto-repair.com show you guide on how to solve P1161 trouble code on resistance error…
AGCO EEM Dosing module Description The dosing module (DM) is installed in the exhaust…
Here is the instruction show you guide on how to solve Caterpillar C9 fault code 64-2…
This instruction show you guide on how to bleed air from the fuel system for…