Doosan heavy duty machine VBO calibration require you to do pump EPPR valve check,so here show you the steps.
Preparations:
Doosan Data Monitoring System DMS-5 DMS-3 Free Download
Pump EPPR valve check
*Calibration judgement
3.1. Measure the input & output current of the pump EPPR valve in certain condition
Ex. DX350LC-7, Normal outputs of pump EPPR valve (Please refer the shop manual to check the exact value
on each model)
3.2. Check the physical condition of the EPPR valve
3.2.1. Assembly condition
3.2.2. External damage
3.2.3. Short circuit
Ex. DX350LC-7(Please refer the shop manual to check the exact value on each model)
3.3. Measure the resistance of the EPPR valve
3.3.1. Measure the resistance of the valve coil: If the measurement is infinite, this indicates an
open circuit of the coil in the valve.
3.3.2. Measure the resistance of the valve coil: If the measurement is 0Ω, this indicates a short
circuit of the coil in the valve.
More topics for Doosan,please refer to:Doosan Trouble Repair
Here is the instruction show you guide on how to replace fuel tank breather filter…
FENDT 900 Vario COM III tractor Component B092 - Sensor, charge air pressure/temperature reports the boost…
Deutz EMR3 Engine Trouble Code 87 / 97 / FlFCD WATER IN FUEL Solution Error description…
This instruction show you guide on how to perform hydraulic flow test for Kubota L3301…
This instruction show you guide on how to configure Lane Departure Warning for Bendix AutoVue…
This instruction show you guide on how to solve AGCO machine SPN102 FMI03 boost pressure…