Doosan heavy duty machine VBO calibration require you to do pump EPPR valve check,so here show you the steps.
Preparations:
Doosan Data Monitoring System DMS-5 DMS-3 Free Download
Pump EPPR valve check
*Calibration judgement
3.1. Measure the input & output current of the pump EPPR valve in certain condition
Ex. DX350LC-7, Normal outputs of pump EPPR valve (Please refer the shop manual to check the exact value
on each model)
3.2. Check the physical condition of the EPPR valve
3.2.1. Assembly condition
3.2.2. External damage
3.2.3. Short circuit
Ex. DX350LC-7(Please refer the shop manual to check the exact value on each model)
3.3. Measure the resistance of the EPPR valve
3.3.1. Measure the resistance of the valve coil: If the measurement is infinite, this indicates an
open circuit of the coil in the valve.
3.3.2. Measure the resistance of the valve coil: If the measurement is 0Ω, this indicates a short
circuit of the coil in the valve.
More topics for Doosan,please refer to:Doosan Trouble Repair
AGCO EEM5 DEF Suction Module Tank sensor (CAN) The DEF suction module with the CAN-bus…
This instruction show you guide on how to remove the threshing drum for CLAAS Lexion…
This instruction show you guide on how to display service menu for Hitachi ZX890-7 excavator.…
Here is the instruction show you guide on how to do Advanced Tool Select and Basic…
Here car-auto-repair.com show you guide on how to solve P1161 trouble code on resistance error…
AGCO EEM Dosing module Description The dosing module (DM) is installed in the exhaust…