Doosan heavy duty machine VBO calibration require you to do pump EPPR valve check,so here show you the steps.
Preparations:
Doosan Data Monitoring System DMS-5 DMS-3 Free Download
Pump EPPR valve check
*Calibration judgement
3.1. Measure the input & output current of the pump EPPR valve in certain condition
Ex. DX350LC-7, Normal outputs of pump EPPR valve (Please refer the shop manual to check the exact value
on each model)
3.2. Check the physical condition of the EPPR valve
3.2.1. Assembly condition
3.2.2. External damage
3.2.3. Short circuit
Ex. DX350LC-7(Please refer the shop manual to check the exact value on each model)
3.3. Measure the resistance of the EPPR valve
3.3.1. Measure the resistance of the valve coil: If the measurement is infinite, this indicates an
open circuit of the coil in the valve.
3.3.2. Measure the resistance of the valve coil: If the measurement is 0Ω, this indicates a short
circuit of the coil in the valve.
More topics for Doosan,please refer to:Doosan Trouble Repair
This instruction show you guide on how to use Launch X431 XPROG 3 programmer to…
This instruction show you guide on how to replace engine rotation speed sensor crankshaft for…
This post show you guide on how to install evaporator for CLAAS Lexion 480 combine.…
This instruction show you guide on how to solve Bobcat engine DCU P1A32 Self-Diagnostis in…
How to Use Hyster Yale PC Service Tool Password Management Function Note: To access…
When you use IDSS diagnostic scan to do some function,it may occur communication error.Sometime you…