Volvo D1-30A Marine Diesel Engines Timing Gear & Injection Pump Installation Guide

This instruction show you guide on how to install timing gear and injection pump for Volvo marine diesel engines D1-13 A, D1-20 A, D1-30 A, D2-40 A.

 

Related Contents:

2018 Volvo Penta VODIA5 5.2.50 Diagnostic Software Free Download

Volvo Penta EPC 6 2022 2016 Offline Free Download

 

1.Install the timing gear plate (1) with new gasket.

2.Oil the camshaft bearing surfaces and carefully lift the camshaft (2) into place, complete with drive gear and regulator weights.

Note:Be careful to avoid damaging the bearings,bearing tracks and camshaft lobes.

3.Install lock plate (3) for the camshaft in the correct position and torque it.

4.Put the key in place in the crankshaft and install the crankshaft pulley (4).

IMPORTANT! The components must be oiled before installation.

IMPORTANT! Make sure that the gear wheel markings coincide.

5.Install the thrust washer (5) on the idler wheel shaft stub. Install the idler wheel (6) in accordance with the markings.

NOTE! Do not turn the crankshaft before the timing gear cover has been installed.

6.Install the inner rotor (7) and the oil pump cover (8). Install shims (9), spring (10), spring washer (11)and lock washer (12).

7.Adjust the oil pump end float (13) to 0.10 – 0.15 mm. Shims (9) are available in thicknesses of 0.10; 0.15; 0.20 and 0.50 mm.

8.Install a new, possibly adjusted gasket for the timing gear cover. Center the cover in front of the oil pump.

Note. Check that the tubular pin (14) in the timing cover can engage in the hole (15) in the oil pump cover.

Turn the cover back and forwards, and center it in the mid position. The stop arm (16) must be turned and held in place when the timing cover is installed.

9.Check that the starter spring (17) is correctly located in the timing cover, and is connected to the regulator arm (18).Put the timing gear cover in place. Insert the regulator arm through the hole in the engine block.

Screw the timing gear cover down.

7.Turn the stop arm (19) clockwise and connect the arm (20) to the injection pump. Install the clip

NOTE! Be careful to ensure that the shim/gasket which was placed underneath the injection pump flange is put back, before the pump is placed in the block (applies when the pump has been removed).

8.Torque the injection pump

9.Install a new front crankshaft seal,place in the crankshaft and install the crankshaft pulley.

auto

Recent Posts

How to Write Engine and Machine ID into ECU for Doosan DL06

After ECU reparogramming,it is necessary to write new engine number and machine ID into ECU.So…

16 hours ago

PCC1302 PowerCommand Low Coolant Level (Warning or Shutdown) Solution

PCC1302 PowerCommand Low Coolant Level (Warning or Shutdown) Solution   Related Contents: 2024 InPower V14.5…

2 days ago

Volvo 2017 Engine Emissions ACM P054415 Exhaust Gas Sensor Error

The function identifies the exhaust temperature and indicates malfunction in the exhaust system. The evaluation…

6 days ago

How to Use MTU DiaSys Diagnostic Software to Connect MTU Engine

MTU DiaSys diagnostic software is professional on MTU engine diagnostics and programming.But seems that is…

1 week ago

Cummings ISX 12 and 15L EPA7 Engine Aftertreatment Injector Flow Test by JPRO

This instruction show you guide on how to use JPRO Diagnostic to do aftertreatment injector…

1 week ago

How to Setup Diagnostic Vendor Adapter for Hyster Yale PC Service Tool

There are several different diagnostic vendor adapter support Hyster and Yale forklift truck,here show you…

1 week ago