Truck Repair

Jungheinrich Junior AME13 Directives for Executing Screwed Joints

Related Contents:

Jungheinrich JETI ForkLift Judit-4 v4.37 4.34 2023 Free Download

Jungheinrich JETI ET 4.37 4.34 EPC 2023 Free Download

2023 Jungheinrich Forklift JETI SH v4.36 v4.34 Service Free Download

 

 

Cut pipe at right angle and deburr

All threaded parts must be oiled (do not grease)

Push nut l and cutting ring 2 over the end of pipe 3

1.Screw nut by hand onto the male member.

2.Push pipe in till it comes to rest.

3.Tighten with wrench about 3/4 turn.

4.The cutting ring will cut itself with its edge into he pipe.

5.Unscrew nut fom male member.

1 Checking the cutting edge.

It is of no importance if the cutting ring can be turned on the end of the pipe.

2 The final fitting on the male member is performed with another 3/4 turn.

For more Jungheinrich trouble repair case,please refer to Jungheinrich Trouble Repair

auto

Recent Posts

How to Solve JCB Machine SPN 103, FMI 0 Turbocharger Speed too High

Here is the instruction show you guide on how to solve JCB machine SPN 103,FMI…

2 hours ago

How to Solve Deutz EMR3 80 / 190 Engine Speed Overrun

This instruction show you guide on how to solve Deutz EMR3 Engine speed overrun 80…

4 days ago

Doosan Stage V Machine U0632 CAN-Receive-Frame Timeout Error Solution

This instruction show you guide on how to solve Doosan Stage V machine U0632 timeout…

1 week ago

CASE IH 20 Series Combine Park Brake Piston Travel and Adjustment

This instruction show you guide on how travel and adjust park brake piston for CASE…

1 week ago

How to Replace Purge Valve for Fendt 900 Vario COM III Tractor?

Here is the instruction show you guide on how to replace purge valve for Fendit…

2 weeks ago

How to Solve JCB SPN 102, FMI 1 Boost Pressure Sensor: Pressure Below Normal

Here is the instruction show you guide on how to JCB machine SPN 102,FMI 1…

2 weeks ago