Categories: Excavator Repair

JCB 3CX 4CX Loader Servo Pressure Supply Valve Dismantling and Assembly

The illustration shown on the opposite page is intended as a guide to dismantling. Be sure to note the location of all components when dismantling. Although some components may appear to be identical they are not interchangeable.
Make sure that components are assembled in their original positions.

 

Related Content:

WinEEM4s JCB Service Tool 2.7.2 2.6.1 Free Download

2024 JCB ServiceMaster 4 v24.3.1 Free Download for Win 10 Win11

2017 JCB Parts Plus+ and Repair Service Manual Free Download

 

Great care should be taken when dismantling and assembling a valve to avoid the following:
• Contamination
• Damage to spools
• Damage to seal grooves
Any of the above may result in possible problems with the operation of the valve.
1 Remove the servo pressure supply valve from the machine

Note: The illustration depicts a complete strip down, but to carry out specific servicing/repairs, e.g. renewal of one of the solenoids, it is only necessary to dismantle the relevant components.

Assembly
Assembly is the reverse of the dismantling sequence.
1 Clean the valve components in an appropriate solvent.
2 Renew all ‘O’ rings and back-up rings.
3 Lubricate parts with JCB Hydraulic Fluid before assembling. Make sure that all the parts move freely.

Accumulator
The accumulator 1 can be removed as shown. Take great care when handling the accumulator, the unit is pre-charged with nitrogen gas and further dismantling of the accumulator should not be attempted. The adaptor assembly 3 incorporates a non-return valve with a spring and ball as shown.

Regulating Valve Assembly
The regulating valve assembly 5 can be removed as shown.
The valve is non-adjustable and is factory set with shims.
Take care to keep all the shims together. JCB ServiceMaster 4 2023

Pressure Relief Valve
The pressure relief valve 6 can be removed as shown.

Solenoid Isolation Valves
The solenoid isolation valves 7 can be removed as shown. It is possible to remove the valve cartridges for cleaning or resealing without removing the complete valve from the machine. If there is evidence of damage to the valve or its seat caused by debris then the cartridge must be renewed.
Note: If removing components from a valve block that is fitted on a machine the pilot circuit accumulator pressure must be vented first. With the operator seat locked in the rear facing position and with the arm rests raised forward (for backhoe operation), switch the starter to ON without
starting the engine. Operate the joystick controls several times to vent the hydraulic pressure from the servo system and backhoe rams. Turn the starter switch to the OFF position and remove the key.

More repair case for JCB,please refer to:JCB Trouble Repair

auto

Recent Posts

Scania Truck ALM 000463 Motion and Inclination Detector,Calibration Fault

This instruction show you guide on how to solve Scania truck motion and inclination detector,…

2 weeks ago

How to Solve JCB Excavator C130C-13 Spool Brake Solenoid Open Circuit

This instruction show you guide on how to solve JCB excavator 140 C130C-13 spool brake solenoid…

2 weeks ago

Scania Truck ALM Alarm System ALM404 Fault in the CAN Communication Solution

Scania truck fault in the CAN communication with the chassis management system (CMS),this instruction show…

4 weeks ago

Perkins Phaser/1000 Series Engine New Water Pumps Changed

The water pumps used on all Phaser/1000 Series engines have been changed. The changes to…

4 weeks ago

Deutz Engine EMR3 Request of Engine OFF Error Solution

Here is the simple instruction on how to solve Deutz engine EMR3 trouble code 48…

1 month ago

How to Use Cat ET 2025A Power Shift Pressure Test Function?

CAT ET 2025A Power Shift Pressure Test function checks whether that the proportional reducing valve is…

1 month ago