Categories: Truck Repair

How to Reset ECU Learned Values for Hino Truck by HINO DX3

HINO DX3 allows you to reset HINO truck ECU learned values.This instruction show you guide on how to do that.

 

Related Contents:

Nexiq USB2 Diagnostic Adapter

2024.03 HINO Diagnostic Explorer DX3/DX2 Diagnostic Software Free Download

HINO Trucks EPC Electronic Parts Catalog 2018 2016 Free Download

 

Procedures:

1 Select Learned Values on the System selection screen.
(System selection screen)

2 When you select a system, a list of Learned Values set for the device is displayed.
(Learned Values screen)

3 You can reset the Learned Values by checking the items you would like to reset and pressing the [Reset] button.
(Learning Values screen)
[Reference]
The value to be reset is the preset initial value.

4 A confirmation screen will be displayed. Check the contents and click or press the [OK] button.
(Reset Confirmation screen)
[Reference]
Click or press the [Cancel] button to return to the Learned Values screen.

5 A message is displayed when writing to the device is complete.
(Reset Completion screen)
[Reference]
• This message is displayed regardless of whether the reset was successful or not.
• Items that have been successfully reset are displayed as

Successful in the ECU writing field.
• Items for which reset has failed are displayed as Failed in the ECU writing field.

More HINO DX3 User Guide,please refer to:How to Use HINO DX3

auto

Recent Posts

Valtra BH Series 140-210 Trouble Internal Roll inertial Sensor Fault

This instruction show you guide on how to solve Valtra BH Series 140-210 trouble code SA…

2 months ago

Caterpillar C9 Engine Throttle Position Out of Calibration 28 91-13 Trouble Solution

This instruction show you guide on how how to solve trouble code 28 PID 91-13…

2 months ago

Magneti Marelli 1 AVB-VW ECU Pinout

Vehicles: With AP 1.6, 1.8 and 2.0 Ml engines DE 97 to 99. And for…

2 months ago

Valtra BH Series 140-210 Internal lateral Inertial Sensor Recalibration

This instruction show you guide on how to solve Valtra BH Series 140-210 trouble code SA…

2 months ago

Bendix AutoVue 3G LDW System Driver Assistance Systems (DAS) Tests

JPRO 2025V3 Driver Assistance Systems (DAS) Tests allows the editing of configuration parameters.   Related Contents:…

2 months ago

How to Solve PCC2300 PowerCommand Membrane Buttons Not Functioning

This instruction show you guide on how to solve PCC2300 Powercommand Membrane buttons not working.…

2 months ago