Categories: Auto Repair

Nissan Consult 3 Plus Active Engine Cylinder Power Balance Test

This article show a guide on how to use Nissan Consult 3 Plus to active engine power balance test.Hope it helps,and if you want to know more about Nissan Consult 3 Plus,check:Nissan Consult 3 Plus Projects.

 

Related Contents:

Nissan Consult 3 Plus Software Download

How to Install Nissan Consult 3 III Plus Diagnostic Software

Nissan Consult 3 Plus Clone Interface

 

 

Procedures:

Connect Nissan Consult 3 Plus to vehicle,then run software.

1.Conducting Active Test:From the “All DTC” screen, select the system you need to test.-In this example we will be looking at the Engine ECU.

 

2.From the “Self Diagnosis Results” screen, select the “Active Test”tab.

 

3.Select the item that requires the test.In this scenario, a “POWER BALANCE” test is being performed to determine which cylinder on the engine is not firing or which cylinder has the weakest performance.

 

 

4.Numerous inputs can be checked whilst the test is being carried out.

In the case of performing a cylinder Balance test, the technician will need to monitor air flow quantity & engine RPM.

Select the desired items & then click “Start”.

5.Select “Monitor Start”and current engine operating values will be displayed.

6.Select the cylinder to test (arrowed) and then click on “Test Start”.

Current engine operating values are now displayed (circled). Record this data and then click on “Reset” to select another cylinder.

Repeat for all cylinders.

auto

Recent Posts

Valtra BH Series 140-210 Internal Inertial Sensor Temperature Error

Here is the instruction show you guide on how to solve Valtra BH Series 140-210…

3 days ago

Caterpillar Excavator Transmission Torque Protection Reset by CAT ET 2025A

This instruction show you guide on how to use CAT ET 2025A to perform transmission…

6 days ago

How to Solve JCB Machine SPN 103, FMI 0 Turbocharger Speed too High

Here is the instruction show you guide on how to solve JCB machine SPN 103,FMI…

1 week ago

How to Solve Deutz EMR3 80 / 190 Engine Speed Overrun

This instruction show you guide on how to solve Deutz EMR3 Engine speed overrun 80…

2 weeks ago

Doosan Stage V Machine U0632 CAN-Receive-Frame Timeout Error Solution

This instruction show you guide on how to solve Doosan Stage V machine U0632 timeout…

2 weeks ago

CASE IH 20 Series Combine Park Brake Piston Travel and Adjustment

This instruction show you guide on how travel and adjust park brake piston for CASE…

2 weeks ago