JCB ISUZU 6HK1 Engine Turbocharger Assembly Removal & Installation Guide

This illustration show you guide on how to remove and install turbocharger assembly fro JCB ISUZU 6HK1 INT-Tier4 engine.

 

Related Contents:

ISUZU E-IDSS 2024 2019 Engine Diagnostic Service System Free Download

ISUZU IDSS MX2-T

 

Procedures:

Removal:

1 Battery Ground Cable Disconnect

Disconnect the battery ground cable from the battery.

Caution: Do not disconnect the battery cable for 1 minute after turning OFF the ignition switch.

 

2Coolant Drain

Drain the coolant from the radiator.

Caution: After the coolant is discharged, make sure to tighten the drain plug.

 

3Turbocharger Assembly Removal

Remove the air cleaner duct from the air cleaner assembly and the turbocharger assembly.

Remove the air intake hose from the turbocharger assembly and the intercooler.

Remove the exhaust pipe from the turbocharger.

Disconnect the oil feed pipe from the turbocharger assembly.

Note: Remove the clip.

Disconnect the oil return pipe from the turbocharger assembly.

Disconnect the water return pipe from the turbocharger assembly.

Disconnect the water feed pipe from the turbocharger assembly.

Note: Remove the clip.

Disconnect the harness connector from the turbocharger assembly.

Remove the turbocharger assembly from the exhaust manifold.

 

Installation:

1Turbocharger Assembly Installation

Replenish the turbocharger assembly with the engine oil.

Align the gasket to the turbocharger assembly.

Install the turbocharger assembly to the exhaust manifold.

tightening torque: 52 N・m { 5.3 kgf・m / 38 lb・ft }

Connect the water feed pipe to the turbocharger assembly.

tightening torque: 41 N・m { 4.2 kgf・m / 30 lb・ft }

Caution: Use a new gasket.

Connect the water return pipe to the turbocharger assembly.

tightening torque: 41 N・m { 4.2 kgf・m / 30 lb・ft }

Caution: Use a new gasket.

Connect the oil return pipe to the turbocharger assembly.

tightening torque: 24 N・m { 2.4 kgf・m / 17 lb・ft }

Caution: Use a new gasket.

Connect the oil feed pipe to the turbocharger assembly.

tightening torque: 34 N・m { 3.5 kgf・m / 25 lb・ft }

tightening torque: 24 N・m { 2.4 kgf・m / 17 lb・ft } Clip

Caution: Use a new gasket.

Install the exhaust pipe to the turbocharger assembly.

Install the air intake hose to the turbocharger assembly and the intercooler.

Install the air cleaner duct to the air cleaner assembly and the turbocharger assembly.

 

2Coolant Filling

Loosen the valve using a wrench.

Replenish the radiator with coolant.

Caution: Be careful not to let coolant overflow splash on the exhaust system parts.

Caution: Coolant overflow should be wiped off.

Tighten the valve using a wrench.

Caution: Use new gaskets.

tightening torque: 22 N・m { 2.2 kgf・m / 16 lb・ft }

Replenish the radiator with coolant.

 

3Battery Ground Cable Connect

Connect the battery ground cable to the battery.

auto

Recent Posts

Scania Truck ALM 000463 Motion and Inclination Detector,Calibration Fault

This instruction show you guide on how to solve Scania truck motion and inclination detector,…

2 weeks ago

How to Solve JCB Excavator C130C-13 Spool Brake Solenoid Open Circuit

This instruction show you guide on how to solve JCB excavator 140 C130C-13 spool brake solenoid…

2 weeks ago

Scania Truck ALM Alarm System ALM404 Fault in the CAN Communication Solution

Scania truck fault in the CAN communication with the chassis management system (CMS),this instruction show…

4 weeks ago

Perkins Phaser/1000 Series Engine New Water Pumps Changed

The water pumps used on all Phaser/1000 Series engines have been changed. The changes to…

4 weeks ago

Deutz Engine EMR3 Request of Engine OFF Error Solution

Here is the simple instruction on how to solve Deutz engine EMR3 trouble code 48…

1 month ago

How to Use Cat ET 2025A Power Shift Pressure Test Function?

CAT ET 2025A Power Shift Pressure Test function checks whether that the proportional reducing valve is…

1 month ago