This instruction show you guide on how to remove center joint and center frame for HITACHI EX5600-7B excavator.
Related Contents:
Hitachi AllinOne MPDr v3.32 v2.25 2021 Diagnostic Software Free Download
Hitachi Excavator ZX-5A ZX-5B ZX-5G Workshop Service Manuals PDF
Procedures:
1 Remove the hoses under center joint (1).
2 Remove bolts (2) (4 used) and washers (3) (4 used).
Remove cover (1).
3 Remove bolts (1) (6 used) and washers (2) (6 used).
Remove cover (3).
j : 22 mm
4 Remove bolts, washers (4) (4 used) and clamps (5) (2 used).
j : 17 mm
5 Disconnect the both ends of pipes (6) (24 used).
j : 17 mm
CAUTION: Upperstructure (1) weight: 50100 kg
(110500 lb)
IMPORTANT: Install a soft rubber onto the wire rope contacting surface in order not to damage the main frame.
6 Install shackles (2 used) to lifting holes (a) (2 places).
Attach nylon slings onto the shackles (2 used).
Attach wire ropes onto counterweight mounting parts (b) (2 places). Hoist and hold upperstructure
(1) by using nylon slings and wire ropes.
7 Put the matching marks on upperstructure (1) and undercarriage (2). Remove bolts (3) (62 used) and washers (4) (62 used). Remove upperstructure (1) from undercarriage (2). Place upperstructure (1) onto wooden blocks.
More repair case for Hitachi,please refer to Hitachi excavator trouble repair
This instruction show you guide on how to remove second tank for CLAAS AXION 960-920…
This instruction show you guide on how to solve Doosan excavator P0408 maximum EGR rate…
Here is the instruction show you guide on how to calibrate 2403 steering valve for…
This function requires all connectors to be disconnected from all electrohydraulic valves on the tractor.You…
How to solve Doosan heavy duty machine P0100 fault code signal error of air mass…
If the vehicle is oscillating on the wayline or catches up the wayline very slowly…