One month ago,we share a post on Kubota V3800 Diesel Engine Every 500 Hours Maintenance.So here another post on how to maintenance Kubota V3800 diesel engine every 1000 hours.
Related Contents:
Takeuchi Excavator Workshop EPC+Service Manual 2018 PDF Files
2022 Kubota Takeuchi Diagmaster v22.08.01 v4.1.2 Software Free Download
Kubota EPC Spare Parts Catalogue 2021.06 Download
Procedures:
Check of Valve Clearance
IMPORTANT
• You must examine and adjust the valve clearance when the engine is cold.
1.Remove the injection pipes and cylinder head cover.
2.Align the “1TC” mark line on the flywheel and projection on the housing. Make sure that the No.1 piston comes to the compression or overlap top dead center.
3.Examine the subsequent valve clearance at the mark “1TC” with a feeler gauge. If the clearance is out of the factory specifications, adjust with the adjusting screw (1) and tighten the lock nut (2) of the adjusting screw.
NOTE
• After you adjust the valve clearance, tighten the lock nut (2) of the adjusting screw.
This instruction show you guide on how to remove second tank for CLAAS AXION 960-920…
This instruction show you guide on how to solve Doosan excavator P0408 maximum EGR rate…
Here is the instruction show you guide on how to calibrate 2403 steering valve for…
This function requires all connectors to be disconnected from all electrohydraulic valves on the tractor.You…
This instruction show you guide on how to remove center joint and center frame for…
How to solve Doosan heavy duty machine P0100 fault code signal error of air mass…