GDS2200 CE Operating System Update Procedure

Double click GDS2200_Installer.exe to start the installation. If an OS update is needed, you will need approximately 30 minutes. Choose Yes when you see the following prompt:

Follow the on-screen instructions. This is Step 1. (Subsequent updates may not need to perform this step; if this is the case, then the process will begin at step 2.)

NOTE: These instructions are available in the appendix at the end of this document.

 

While step 1 of the operating system update is in progress, the bar graph shows the current status. This Bar graph will complete two times; when this has completed for the second time and the progress bar is no longer moving the HDS tablet tester requires

REBOOTING! Reboot the tablet tester.

This is step 2.

NOTE: These instructions are available in the appendix at the end of this document.

While step 2 of the Operating System update is in progress, the bar graph shows the current status. This bar graph will complete two times.

After the bar graph has complete two times the Teradyne Diagnostic Solutions screen will appear for approximately 4 minutes. Do not touch the Tablet screen or undock the Tablet during this screen.

This is Step 3.

The tester will reboot automatically. It may take up to 2 minutes for the reboot to complete.

When the tester has rebooted, the following screen will be displayed.

After approximately 2 minutes, the tester will be rebooted again. This reboot may take up to a further 2 minutes to complete, during which time the following screen will be displayed.

Once the Operating System has been successfully installed, click Finish.

The HDS software will automatically load. Follow all screen prompts carefully.

auto

Recent Posts

Doosan Stage V Engine Excavator U013C Trouble Code Solution

This instruction show you guide on how to solve Doosan Stage V excavator U013C trouble…

1 day ago

JCB JS140 Excavator C130C-13 Spool Brake Solenoid Open Circuit Solution

This instruction show you guide on how to solve spool brake solenoid open circuit for…

4 days ago

Perkins 400A 400D Industrial Engine Crankshaft Rear Seal Remove and Install

This instruction show you guide on how to remove and install crankshaft rear seal for…

7 days ago

JPRO Diagnostic Software SCR Performance and System Test on Cummings

This instruction show you guide on how to use JPRO diagnostic to do SCR performance…

1 week ago

Yale ERP15-20VT G807 Forklift Truck Master Cylinder Removal and Disassemble Guide

Here is the instruction show you guide on how to remove and disassemble master cylinder…

2 weeks ago

How to Solve Deutz EMR3 71 / 2791 / EGRCD_SigNpl Error?

This instruction show you guide on how to solve Deutz EMR engine 71 / 2791 /…

2 weeks ago