Doosan E-Powerpack P3A02 cell over voltage fault trouble repair guide.
Related Contents:
Doosan e-Doctor 2.4.0.7 2023.06 100% Work
Doosan Heavy Duty Machine 2020 Service Manual Download
Reason:
Highest cell voltage > 4.25V
Module wire failure
Secondary BMS sensing problem
Effect:
Disable charge
Charge Power(W) = 0
Charge Current(A) = 0
1) Component Location:
<Cell wire>
Damaged somewhere
2) <Secondary BMS>
3) Condition for Running Diagnostic
During charging
4) Condition for Setting the Fault Code
Overcharge or abnormal cell voltage rise(Highest cell voltage > 4.25V)
5) Condition for Clearing the Fault Code
Operate the machine to discharge to the Highest cell voltage ≤ 4.15V
6) How to Solve Doosan E-Powerpack P3A02 cell over voltage
Step 1:
P3A02 is detected on service tool?
Reference value CV_HI>4.25V,Yes go to step 2
Step 2:
Disconnect the battery charger.
Operate the machine to discharge cell voltage in less
than 1 hr. Check the highest cell voltage(CV_HI) via
service tool.
Is P3A02 disappeared?
Reference value CV_HI<4.25V,Problem solved
More topics for Doosan,please refer to:Doosan Trouble Repair
This instruction show you guide on how to solve Scania truck motion and inclination detector,…
This instruction show you guide on how to solve JCB excavator 140 C130C-13 spool brake solenoid…
Scania truck fault in the CAN communication with the chassis management system (CMS),this instruction show…
The water pumps used on all Phaser/1000 Series engines have been changed. The changes to…
Here is the simple instruction on how to solve Deutz engine EMR3 trouble code 48…
CAT ET 2025A Power Shift Pressure Test function checks whether that the proportional reducing valve is…