Doosan heavy duty machine VBO calibration require you to do pump EPPR valve check,so here show you the steps.
Preparations:
Doosan Data Monitoring System DMS-5 DMS-3 Free Download
Pump EPPR valve check
*Calibration judgement
3.1. Measure the input & output current of the pump EPPR valve in certain condition
Ex. DX350LC-7, Normal outputs of pump EPPR valve (Please refer the shop manual to check the exact value
on each model)
3.2. Check the physical condition of the EPPR valve
3.2.1. Assembly condition
3.2.2. External damage
3.2.3. Short circuit
Ex. DX350LC-7(Please refer the shop manual to check the exact value on each model)
3.3. Measure the resistance of the EPPR valve
3.3.1. Measure the resistance of the valve coil: If the measurement is infinite, this indicates an
open circuit of the coil in the valve.
3.3.2. Measure the resistance of the valve coil: If the measurement is 0Ω, this indicates a short
circuit of the coil in the valve.
More topics for Doosan,please refer to:Doosan Trouble Repair
This instruction show you guide on how to solve spool brake solenoid open circuit for…
This instruction show you guide on how to remove and install crankshaft rear seal for…
This instruction show you guide on how to use JPRO diagnostic to do SCR performance…
Here is the instruction show you guide on how to remove and disassemble master cylinder…
This instruction show you guide on how to solve Deutz EMR engine 71 / 2791 /…
Here is the instruction show you guide on how to repair P0731 incorrect 2nd gear ration…